Published 2023-05-08
Keywords
- Overturning Stability ,
- Pinion Stiffness,
- Jack Up Rig,
- Mobile Offshore Drilling Unit ,
- MODU
- Mobile Offshore Production Unit,
- MOPU,
- Dynamic Amplification Factor,
- DAF ...More
Copyright (c) 2023 Thomas Stephen, Neethu Narayanan , Tomin Mathew

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
How to Cite
Abstract
A drilling rig is often chosen by the decision makers for a Mobile Offshore Drilling Unit (MODU) to Mobile Offshore Production Unit (MOPU) conversion project without having a proper pre-purchase engineering study to verify the suitability of the rig for the MOPU project. This decision is often governed by the purchase value of the drilling rig for conversion and the maximum operation limitations of the drilling rig as specified by the Marine Operation Manual (MOM) if the drilling rig. This could lead to sever engineering challenges during the project execution which require unusual remedial actions or sometimes even abandoning the project. In this paper, a detailed discussion is presented particularly with regards to the structural engineering aspects of a MODU to MOPU conversion project.